The Powermaster SG-101 Slide Gate Operator Kit 3 is designed for heavy-duty residential, commercial, and industrial sliding gate applications. Powered by a 1HP high-performance motor, the SG-101 offers exceptional strength, smooth operation, and long-lasting durability.
This advanced security kit includes:
Seco-Larm Photo Cell E-931-S50RRG6Q for accurate obstacle detection
Linear Receiver 109950 for long-range wireless communication
Two Linear Remotes 308912 for convenient entry
Wireless Keypad DOL1000MF + Module 300 for secure coded access
The combination of safety sensors, multi-access capability, and durable operator construction makes Kit 3 ideal for high-traffic gates requiring both performance and security.
Heavy-duty 1HP motor for commercial/industrial applications
Supports 115/230V operation
Seco-Larm photo cell ensures reliable obstruction detection
Linear receiver 109950 provides stable wireless connectivity
Includes 2 remote controls (308912)
Wireless keypad DOL1000MF + Module 300 for secure access
Smooth and powerful gate movement
Weather-resistant steel housing
Easy to program and install
Ideal for gated communities, warehouses, facilities, and parking areas
Verify power source (115/230V) before installation.
Mount operator on a solid concrete base.
Align gate with track and ensure free movement.
Install Seco-Larm photo cell at correct height for detection.
Install Linear receiver 109950 and program remotes 308912.
Mount wireless keypad and connect Module 300.
Configure control board, set travel limits, and test full motion.
Confirm safety sensor response before daily operation.
Installation must be completed by certified personnel.
Disconnect all power before servicing the unit.
Keep people, pets, and vehicles clear of the moving gate.
Test safety devices (photo cell + keypad) regularly.
Do not exceed gate weight/length specifications.
Ensure wiring and connections are securely fastened.
Clean the Seco-Larm photo cell lens weekly.
Test wireless keypad weekly to verify response time.
Replace remote batteries every 6–12 months.
Use surge protection on the control board.
Lubricate track and check rollers routinely.
Confirm receiver range periodically to ensure strong signal.