The PowerMaster CSG Slide Gate Operator Kit 2 is a complete commercial-grade solution for automatic sliding gate access control. Powered by a 1/2 horsepower motor operating on 115V single-phase power, this kit is engineered for reliable, continuous-duty performance in commercial, industrial, and controlled-access residential environments.
This kit includes the Seco-Larm E-931-S50RRG6Q photo cell safety sensor, a Linear 109950 receiver, and two 308912 remote transmitters, providing both enhanced safety and convenient wireless control. Designed for smooth gate movement and long-term durability, the CSG operator integrates seamlessly with access control systems while meeting professional installation standards.
CSG slide gate operator kit.
1/2HP motor for commercial-grade performance.
115V single-phase power.
Includes E-931-S50RRG6Q photo cell safety sensor.
Includes Linear receiver (109950).
Includes two Linear remote transmitters (308912).
Heavy-duty construction for continuous-duty cycles.
Smooth, reliable sliding gate operation.
Compatible with access control and safety devices.
Ensure the sliding gate moves freely and is properly aligned.
Disconnect electrical power before installation.
Mount the CSG operator per PowerMaster installation guidelines.
Connect 115V single-phase power in accordance with local codes.
Install and align the E-931-S50RRG6Q photo cell sensor.
Install the Linear receiver and program the two remotes.
Adjust travel limits and force settings.
Restore power and perform complete operational and safety testing.
Installation must be completed by qualified professionals.
Always disconnect power before servicing the operator.
Photo cell sensor must be properly aligned and tested.
Verify remote controls operate only as intended.
Perform routine safety and operational inspections.
Ideal for commercial, industrial, and gated residential applications.
Use genuine PowerMaster and Linear accessories for compatibility.
Consider adding additional safety devices such as loops or edge sensors.
Inspect photo cell alignment periodically.
Schedule regular maintenance for optimal long-term performance.